On this behind-the-scenes walking tour, we will visit the four levels already open to the public and experience the public art installations that are part of the multimodal Salesforce Transit Center. We will also visit the two-level train box built under the Transit Center, which will ultimately serve Caltrain and California High-Speed Rail's statewide system through The Portal.
We will meet in the Marriot Marquis lobby and walk over to the Salesforce Transit Center. The tour will end on the rooftop of Salesforce Park, which is about a 15-minute walk back to the hotel.
NOTE: During this tour, we’ll be walking (flat and flights of stairs) within the facility’s four-and-half block footprint facility so please wear comfortable (closed-toe) shoes. Also, we will take escalators and elevators during the tour. The two-level trainbox has active construction going on so we’ll be requiring participants to sign a waiver.
Tour Capacity: 30 participants
Location: Meet in the Lobby, San Francisco Marriott Marquis
Location: Meet in the Lobby, San Francisco Marriott Marquis
Join the Transbay Joint Powers Authority on a walking tour of the transit-oriented neighborhood developed as part of its Transbay Program, which has transformed nearly 19 acres into housing, commercial and open spaces found around the Salesforce Transit Center.
We will visit the four levels already open to the public and experience the public art installations that are part of the multimodal Transit Center and point out the former freeway ramps and surface parking lots surrounding it that were converted into downtown's newest and highest value office and residential towers. Attendees will visit the already built train box underneath the Transit Center, which will ultimately serve Caltrain and California High-Speed Rail's statewide system through The Portal.
We will meet in the Marriot Marquis lobby and walk over to the Transit Center. The tour will end on the rooftop of Salesforce Park, which is about a 15-minute walk back to the hotel.
NOTE: During this tour, we will be walking within and around the Transit Center so please wear comfortable (closed-toe) shoes. Also, we will take flights of stairs, escalators and elevators during the tour.The trainbox has active construction going on so we’ll be requiring participants to sign a waiver.
Tour Capacity: 30 participants
Location: Meet in the Lobby, San Francisco Marriott Marquis
Location: Meet in the Lobby, San Francisco Marriott Marquis
High-speed rail infrastructure is here in the Bay Area. Learn how investments and partnerships in Caltrain Electrification paves the way for California High-Speed Rail. We will learn about the Northern California high-speed rail alignment while riding the new all-electric Caltrain service; learn about the Northern California high-speed rail alignment, how Caltrain electrification will support future high-speed rail service and the infrastructure necessary to build on that work to introduce high-speed trains in a blended service vision and connecting the Bay Area to the statewide high-speed rail system.
This tour will be led by California High-Speed Rail Authority.
For those who want to walk or take transit together, meet at 1:00pm in the Marriot Marquis lobby. From the hotel, the station is a 20-minute walk, or a 15-minute ride on the T Sunnydale-direction from Yerba Buena/Moscone Station to 4th St & King St Station (2 stops).
Tour Capacity: 25 participants
Location: Meet in the Lobby, San Francisco Marriott Marquis
Location: Meet in the Lobby, San Francisco Marriott Marquis